2025 Ccmg Water Main Replacements
One of 10,000+ projects Taiyo tracks in Indiana.
Source: Dodge
The project generally consists of the installation of approximately 1,855 lineal feet of new 4-inch water main along Buck Street, Wall Street, and Water Street in Shelburn, Indiana. In addition to the water main installation, work also includes new flush hydrants, gate valves, new water service lines, and site restoration.
- Status
- Closed
- Sector
- Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Government, Manufacturing (Industrial)
- Location
- Shelburn, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Ccmg Water Main Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project generally consists of the installation of approximately 1,855 lineal feet of new 4-inch water main along Buck Street, Wall Street, and Water Street in Shelburn, Indiana. In addition to the water main installation, work also includes new flush hydrants, gate valves, new water service lines, and site restoration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Shelburn |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
