logo

2025 Cemetery Bridge Replacement

Sector: Metal • Location: Wilmington, Ohio, United States of America

Source: Dodge

Project
Closed

2025 CEMETERY BRIDGE REPLACEMENT project includes site preparation and installation of a pre-cast aluminum structure and minimal paving in Sugar Grove Cemetery in Wilmington, Ohio. The Contractor is to be aware that this work will take place in an active Cemetery

Status
Closed
Sector
Metal, Steel, Road, Government, Bridge, Commercial
Location
Wilmington, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2025 Cemetery Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2025 Cemetery Bridge Replacement” is an infrastructure initiative in the Metal sector, located in Wilmington, Ohio, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

2025 CEMETERY BRIDGE REPLACEMENT project includes site preparation and installation of a pre-cast aluminum structure and minimal paving in Sugar Grove Cemetery in Wilmington, Ohio. The Contractor is to be aware that this work will take place in an active Cemetery

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Wilmington

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Metal, Steel, Road, Government, Bridge, Commercial

Article published date

2025-07-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project