2025 Citywide Pavement Repair for Water Utilities
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge
This project consists of the removal of temporary asphalt placed in City streets where repairs have been made and the placement of new permanent pavement, and the installation of striping, pavement markings, markers & traffic loops.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Transmission, Road, Power Generation (CCGT), Government
- Location
- Redlands, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Citywide Pavement Repair for Water Utilities
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the removal of temporary asphalt placed in City streets where repairs have been made and the placement of new permanent pavement, and the installation of striping, pavement markings, markers & traffic loops. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Redlands |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Transmission, Road, Power Generation (CCGT), Government |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
