2025 Concrete Maintenance Program
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The program consists of approximately 1,100 square feet of intermittent removal and replacement of concrete sidewalk and 285 square yards of PCC alley pavement removal and replacement located throughout the City. The program may also include the installation of detectable warning panels, intermittent curb and gutter removal and replacement, PCC driveway pavement, landscape restoration, and all inc
- Status
- Closed
- Sector
- Cement, Government, Car parking, Automotive, Road, Commercial
- Location
- West Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Concrete Maintenance Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The program consists of approximately 1,100 square feet of intermittent removal and replacement of concrete sidewalk and 285 square yards of PCC alley pavement removal and replacement located throughout the City. The program may also include the installation of detectable warning panels, intermittent curb and gutter removal and replacement, PCC driveway pavement, landscape restoration, and all incidental and collateral work necessary to complete the project as shown on the Plans. All quantiti... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | West Chicago |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Car parking, Automotive, Road, Commercial |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
