2025 Concrete Pavement Replacement
Closed · Missouri · Last reported Jan 2025
Source: Dodge
The project will consist of Concrete Pavement Replacement on select City streets within Harmann Estates Subdivision. The subdivision is located between Mark Twain Lane and Old St. Charles Road, just south of Highway 70. Anticipated subdivision streets include Archerton Drive, Archerton Court, Beaverton Drive, Beaverton Court, Brookington Drive, Brookington Court, Buddington Court, and Harmann Esta
- Status
- Closed
- Sector
- Government, Cement, Road, Commercial, Manufacturing (Industrial)
- Location
- Bridgeton, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Concrete Pavement Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will consist of Concrete Pavement Replacement on select City streets within Harmann Estates Subdivision. The subdivision is located between Mark Twain Lane and Old St. Charles Road, just south of Highway 70. Anticipated subdivision streets include Archerton Drive, Archerton Court, Beaverton Drive, Beaverton Court, Brookington Drive, Brookington Court, Buddington Court, and Harmann Estates Court. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Bridgeton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Cement, Road, Commercial, Manufacturing (Industrial) |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
