logo
ProjectClosed

2025 Crack Sealing Project

Closed · Missouri · Last reported Sep 2025

Source: Dodge

The project consists of thorough cleaning, preparing and sealing of existing joints and cracks in concrete and asphalt pavements, curbs and driveways of approximately 20 miles of streets. The awarded Contractor shall have 60 days from the date of Notice to Proceed to complete the project.

Status
Closed
Sector
Road, Commercial, Manufacturing (Industrial), Government, Cement
Location
Chesterfield, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2025 Crack Sealing Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2025 Crack Sealing Project” is an infrastructure initiative in the Road sector, located in Chesterfield, Missouri, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of thorough cleaning, preparing and sealing of existing joints and cracks in concrete and asphalt pavements, curbs and driveways of approximately 20 miles of streets. The awarded Contractor shall have 60 days from the date of Notice to Proceed to complete the project.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Chesterfield

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Commercial, Manufacturing (Industrial), Government, Cement

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project