2025 Crack Sealing Project
One of 10,000+ projects Taiyo tracks in Missouri.
Source: Dodge
The project consists of thorough cleaning, preparing and sealing of existing joints and cracks in concrete and asphalt pavements, curbs and driveways of approximately 20 miles of streets. The awarded Contractor shall have 60 days from the date of Notice to Proceed to complete the project.
- Status
- Closed
- Sector
- Government, Cement, Commercial, Road, Manufacturing (Industrial)
- Location
- Chesterfield, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Crack Sealing Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of thorough cleaning, preparing and sealing of existing joints and cracks in concrete and asphalt pavements, curbs and driveways of approximately 20 miles of streets. The awarded Contractor shall have 60 days from the date of Notice to Proceed to complete the project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Chesterfield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Cement, Commercial, Road, Manufacturing (Industrial) |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
