2025 Cross Plains Street Rehabilitation and Maintenance
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Concrete curb and sidewalk construction and asphalt pavement, consisting of these approximate units: Concrete Curb & Gutter (600 lineal feet), Concrete Sidewalk and Driveways (400 square feet), Remove Asphalt and Fine Grade Base (8,500 square yards), and Hot-Mix Asphalt Pavement (1,800 tons). The quantities are subject to change without notice prior to document distribution.
- Status
- Closed
- Sector
- Cement, Car parking, Road, Government, Automotive, Commercial
- Location
- Cross Plains, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Cross Plains Street Rehabilitation and Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Concrete curb and sidewalk construction and asphalt pavement, consisting of these approximate units: Concrete Curb & Gutter (600 lineal feet), Concrete Sidewalk and Driveways (400 square feet), Remove Asphalt and Fine Grade Base (8,500 square yards), and Hot-Mix Asphalt Pavement (1,800 tons). The quantities are subject to change without notice prior to document distribution. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Cross Plains |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Road, Government, Automotive, Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
