2025 CTH O Reconditioning & Structures
Sector: Water Supply and Storage • Location: Mauston, Wisconsin, United States of America
Source: Dodge
The Project includes the following Work: The overall project will consist of pulverize & overlay of approximately 15,000 LF of Juneau CTH O (from Franklin St to Leverenz Rd) with approximately 400 LF of complete roadway reconstruction including new base aggregate, removal and replacement of three box culvert/bridge structures, culvert replacements, paving with 4.0-inches of asphalt, ditching, and
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Bridge, Road, Commercial
- Location
- Mauston, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 CTH O Reconditioning & Structures
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: The overall project will consist of pulverize & overlay of approximately 15,000 LF of Juneau CTH O (from Franklin St to Leverenz Rd) with approximately 400 LF of complete roadway reconstruction including new base aggregate, removal and replacement of three box culvert/bridge structures, culvert replacements, paving with 4.0-inches of asphalt, ditching, and side slope grading. The anticipated substantial completion date is October 18, 2025 and final com... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Mauston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Bridge, Road, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
