2025 Cuba City Residential Utility and Paving Improvements
Sector: Water Supply and Storage • Location: Cuba City, Wisconsin, United States of America
Source: Dodge
Cuba City Residential Development - to include: Reagan Street (2070 LF), Model Road (810 LF), Johnson Court (460 LF), Bush Court (420 LF), and Troy Street (90 LF) Reconstruction to include work under the following contracts: Contract #1 Underground Utilities, Excavation, Gravel Work will include installation of water main, fittings, valves, hydrants, water services, sewer main, sewer manholes, sto
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road, Car parking, Residential, Power Transmission, Automotive, Power Generation (CCGT)
- Location
- Cuba City, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Cuba City Residential Utility and Paving Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Cuba City Residential Development - to include: Reagan Street (2070 LF), Model Road (810 LF), Johnson Court (460 LF), Bush Court (420 LF), and Troy Street (90 LF) Reconstruction to include work under the following contracts: Contract #1 Underground Utilities, Excavation, Gravel Work will include installation of water main, fittings, valves, hydrants, water services, sewer main, sewer manholes, storm sewer, storm inlets, storm manholes street excavation, gravel placement, restoration of the wo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Cuba City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road, Car parking, Residential, Power Transmission, Automotive, Power Generation (CCGT) |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
