2025 Curb & Gutter Program
Sector: Cement • Location: Harrisonville, Missouri, United States of America
Source: Dodge
The work under this Contract consists of the following: Contractor providing the labor, materials, and equipment to remove and replace concrete ADA ramps, sidewalks, driveway approaches, curbs, and gutters at various locations and as detailed herein including mobilization, traffic controls, grading, and site restoration.
- Status
- Closed
- Sector
- Cement, Car parking, Road, Government, Automotive, Commercial
- Location
- Harrisonville, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Curb & Gutter Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work under this Contract consists of the following: Contractor providing the labor, materials, and equipment to remove and replace concrete ADA ramps, sidewalks, driveway approaches, curbs, and gutters at various locations and as detailed herein including mobilization, traffic controls, grading, and site restoration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Harrisonville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Road, Government, Automotive, Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
