logo
ProjectBidding

2025 Denton Water Line Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

This project includes construction of approximately: 2,220 LF 12 C900 PVC Water Line (Open Cut) 430 LF 12 C900 PVC Water Line (By Other Than Open Cut) 570 LF 12 HDPE Water Line (Pre-chlorinated Pipe Bursting) 2,740 LF 8 C900 PVC Water Line (Open Cut) 840 LF 8 C900 PVC Water Line (By Other Than Open Cut) 450 LF 6 C900 PVC Water Line (Open Cut) 100 LF 6 C900 PVC Water Line (By Other Than Open Cut) 1

Status
Prospective
Sector
Water Supply and Storage, Commercial, Chemical (Industrial), Waste Processing and Treatment, Steel, Government, Metal, Manufacturing (Industrial)
Location
Denton, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2025 Denton Water Line Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2025 Denton Water Line Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Denton, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project includes construction of approximately: 2,220 LF 12 C900 PVC Water Line (Open Cut) 430 LF 12 C900 PVC Water Line (By Other Than Open Cut) 570 LF 12 HDPE Water Line (Pre-chlorinated Pipe Bursting) 2,740 LF 8 C900 PVC Water Line (Open Cut) 840 LF 8 C900 PVC Water Line (By Other Than Open Cut) 450 LF 6 C900 PVC Water Line (Open Cut) 100 LF 6 C900 PVC Water Line (By Other Than Open Cut) 1,270 LF 2 Polyethylene SDR-9 Water Line (By Other Than Open Cut) 120 LF 24 I.D. x 3/8 Thick Steel...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Denton

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Chemical (Industrial), Waste Processing and Treatment, Steel, Government, Metal, Manufacturing (Industrial)

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project