logo

2025 Directional Boring Contract

Sector: Government • Location: River Falls, Wisconsin, United States of America

Source: Dodge

Project
Closed

The City of River Falls will receive bids for the 2025 Directional Boring Contract. The work specified in this contract consists of furnishing and installing HDPE conduit using the horizontal directional drilling (HDD) method of installation, also commonly referred to as directional boring or guided horizontal boring. This work shall include all necessary services, equipment, and labor for the com

Status
Closed
Sector
Government, Commercial, Power Generation (CCGT), Power Transmission
Location
River Falls, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2025 Directional Boring Contract

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2025 Directional Boring Contract” is an infrastructure initiative in the Government sector, located in River Falls, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of River Falls will receive bids for the 2025 Directional Boring Contract. The work specified in this contract consists of furnishing and installing HDPE conduit using the horizontal directional drilling (HDD) method of installation, also commonly referred to as directional boring or guided horizontal boring. This work shall include all necessary services, equipment, and labor for the complete and proper installation, testing, surface restoration, replacement of any damaged utilities...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

River Falls

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Commercial, Power Generation (CCGT), Power Transmission

Article published date

2025-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project