2025 Districbution Pipeline Replacement
Sector: Water Supply and Storage • Location: West Jordan, Utah, United States of America
Source: Dodge
The Owner s project includes the replacement of existing pipelines in Murray City. The pipelines to be replaced are located in the right-of-way maintained by Murray City. The roads in which pipelines shall be replaced are listed as follows: Hemmingway Dr. from Lakeside Dr. to 1300 E, Lupine Way from Hemmingway Dr. to Hyland Lake Dr., Lillie Circle, Johnson Circle, Sandra Circle, 5935 S, 1320 E, 59
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Owner s project includes the replacement of existing pipelines in Murray City. The pipelines to be replaced are located in the right-of-way maintained by Murray City. The roads in which pipelines shall be replaced are listed as follows: Hemmingway Dr. from Lakeside Dr. to 1300 E, Lupine Way from Hemmingway Dr. to Hyland Lake Dr., Lillie Circle, Johnson Circle, Sandra Circle, 5935 S, 1320 E, 5985 S, 1430 E from Vine St. to Bella Vie Ct., and 6050 S. All of the PVC pipeline work listed abov... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
