2025 Douglas County Culvert Reconstruction
Sector: Water Supply and Storage • Location: Omaha, Nebraska, United States of America
Source: Dodge
Temporary Traffic Control Remove, Salvage and Reinstall Stop Sign Sawcut Full Depth and Remove Existing Pavement Remove 18 I.D. Culvert Pipe Remove 30 I.D. Culvert Pipe Remove 36 I.D. Culvert Pipe Remove 54 I. D. Area Inlet Remove 18 Flared End Section Remove 30 Flared End Section Remove 36 Flared End Section Construct 18 RCP
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial
- Location
- Omaha, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Douglas County Culvert Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Temporary Traffic Control Remove, Salvage and Reinstall Stop Sign Sawcut Full Depth and Remove Existing Pavement Remove 18 I.D. Culvert Pipe Remove 30 I.D. Culvert Pipe Remove 36 I.D. Culvert Pipe Remove 54 I. D. Area Inlet Remove 18 Flared End Section Remove 30 Flared End Section Remove 36 Flared End Section Construct 18 RCP |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Omaha |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
