2025 Fair Meadow Drive Reconstruction Project
Sector: Water Supply and Storage • Location: Webster City, Iowa, United States of America
Source: Dodge USA
The 2025 Fair Meadow Drive Reconstruction Project is located on Fair Meadow Drive between Rodlyn Road and Des Moines Street within the City of Webster City. The project consists of approximately 2,585 LF of curb and gutter; 4,344 SY of asphalt pavement standard Traffic 1/2 inch mix, PG 58-28S; 6,027 SY of pavement removal; 1,104 SY of 6-inch thick PCC driveway pavement; 781 SY of 4-inch thick PCC
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Road, Car parking, Commercial, Automotive
- Location
- Webster City, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2025 Fair Meadow Drive Reconstruction Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 2025 Fair Meadow Drive Reconstruction Project is located on Fair Meadow Drive between Rodlyn Road and Des Moines Street within the City of Webster City. The project consists of approximately 2,585 LF of curb and gutter; 4,344 SY of asphalt pavement standard Traffic 1/2 inch mix, PG 58-28S; 6,027 SY of pavement removal; 1,104 SY of 6-inch thick PCC driveway pavement; 781 SY of 4-inch thick PCC Sidewalk; 6,233 SY of subgrade treatment, geogrid type 2; 6,233 SY of modified subbase (City Furn... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Webster City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Road, Car parking, Commercial, Automotive |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
