2025 Garden City Compost Facility Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Base Bid Work is generally described as follows: Excavation and onsite stockpiling of approximately 15,000 yd3 of unsuitable fill material; Import, backfill and compaction of approx. 22,300 yd3 of 4"-minus structural fill; 12-bay, aerated static pile (ASP) composting system with reversing pressure operating capabilities complete with: blowers; VFD s; aeration piping; dampers; in-floor aeration gra
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Waste Processing and Treatment, Commercial
- Location
- Missoula, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Garden City Compost Facility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Base Bid Work is generally described as follows: Excavation and onsite stockpiling of approximately 15,000 yd3 of unsuitable fill material; Import, backfill and compaction of approx. 22,300 yd3 of 4"-minus structural fill; 12-bay, aerated static pile (ASP) composting system with reversing pressure operating capabilities complete with: blowers; VFD s; aeration piping; dampers; in-floor aeration grates; concrete slab, push walls & footings; embedments; condensate collection and conveyance syste... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Missoula |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Waste Processing and Treatment, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
