2025 Gravity Sewer Relining
Sector: Water Supply and Storage • Location: Lake Stevens, Washington, United States of America
Source: Dodge USA
The District is not responsible for any costs incurred in response to this Invitation to Bid. The project work is located in Lake Stevens, Snohomish County, WA. The purpose of this project is to: Install approximately 43,575 linear feet of cured in place sanitary sewer mains in various sizes between 6-inches and 15-inches Install grout into approximately 450 lateral connections May require up to 7
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Chemical (Industrial), Road, Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Lake Stevens, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2025 Gravity Sewer Relining
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The District is not responsible for any costs incurred in response to this Invitation to Bid. The project work is located in Lake Stevens, Snohomish County, WA. The purpose of this project is to: Install approximately 43,575 linear feet of cured in place sanitary sewer mains in various sizes between 6-inches and 15-inches Install grout into approximately 450 lateral connections May require up to 700 gallons of chemical grout Project work also includes temporary traffic control, erosion and se... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Lake Stevens |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Chemical (Industrial), Road, Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
