2025 Hibbing Fire Hydrant Replacement
Closed · Minnesota · Last reported Sep 2025
Source: Dodge
ITEM QUANTITY UNIT Hydrant 48 EACH Concrete Curb and Gutter 300 LF 6" Gate Valve and Box 52 EACH Watermain Fittings 2155 LBS 6" PVC Watermain 240 LF Site Restoration 1775 SY Bituminous Patch 1725 SY Traffic Control 1 LSITEM QUANTITY UNIT Hydrant 48 EACH Concrete Curb and Gutter 300 LF 6 Gate Valve and Box 52 EACH Watermain Fittings 2155 LBS 6 PVC Watermain 240 LF Site Restoration 1775 SY Bituminou
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Cement, Government
- Location
- Kelly Lake, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Hibbing Fire Hydrant Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ITEM QUANTITY UNIT Hydrant 48 EACH Concrete Curb and Gutter 300 LF 6" Gate Valve and Box 52 EACH Watermain Fittings 2155 LBS 6" PVC Watermain 240 LF Site Restoration 1775 SY Bituminous Patch 1725 SY Traffic Control 1 LSITEM QUANTITY UNIT Hydrant 48 EACH Concrete Curb and Gutter 300 LF 6 Gate Valve and Box 52 EACH Watermain Fittings 2155 LBS 6 PVC Watermain 240 LF Site Restoration 1775 SY Bituminous Patch 1725 SY Traffic Control 1 LS. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Kelly Lake |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Cement, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
