2025 Hot Mix Asphalt Patching
One of 10,000+ projects Taiyo tracks in Illinois.
Source: Dodge
To bid on this project, Contractors shall be required provide a valid IDOT Certificate of Eligibility and obtain an approved c Authorization to Bid . The proposed partial depth hot-mix asphalt patching consists of milling 2 and resurfacing with 2 of hot-mix asphalt surface course. Contingency quantities of detector loops and short term pavement markings are included. Traffic control and protection
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Government, Commercial
- Location
- Libertyville, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Hot Mix Asphalt Patching
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To bid on this project, Contractors shall be required provide a valid IDOT Certificate of Eligibility and obtain an approved c Authorization to Bid . The proposed partial depth hot-mix asphalt patching consists of milling 2 and resurfacing with 2 of hot-mix asphalt surface course. Contingency quantities of detector loops and short term pavement markings are included. Traffic control and protection is also required. There is a small addition to the normal patching work to be performed on the c... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Libertyville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Government, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
