2025 Infrastructure and Paving
Sector: Water Supply and Storage • Location: Camp Hill, Pennsylvania, United States of America
Source: Dodge
The Project generally consists of two parts with Part-A being Hauling and Placement of WMA paving and milling work within the Highland Estates and Highland Village Developments, with approximately 2200 tons of 9.5-mm wearing course, 1000 tons of 9.5-mm scratch/leveling course with all Asphalt, purchased by the Township, will be supplied by Pennsy Supply Inc. through COSTARS, 24,200 SY of paving fa
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Manufacturing (Industrial), Car parking, Road, Automotive, Commercial
- Location
- Camp Hill, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Infrastructure and Paving
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project generally consists of two parts with Part-A being Hauling and Placement of WMA paving and milling work within the Highland Estates and Highland Village Developments, with approximately 2200 tons of 9.5-mm wearing course, 1000 tons of 9.5-mm scratch/leveling course with all Asphalt, purchased by the Township, will be supplied by Pennsy Supply Inc. through COSTARS, 24,200 SY of paving fabric, and approximately 24,200 SY of milling, various depths. Storm water piping consisting of 55... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Camp Hill |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Manufacturing (Industrial), Car parking, Road, Automotive, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
