logo

2025 Integrated Resource Plan (IRP)

Sector: Power Generation (CCGT) • Location: Atlanta, Georgia, United States

Source: PR Newswire

Project
Planned

Georgia Power has filed its 2025 Integrated Resource Plan (IRP) to meet the energy needs of its customers and support the state's growth. The plan includes investments in generation and transmission systems, enhancements to the power grid, and a focus on renewable energy options.

Status
Prospective
Sector
Power Generation (CCGT)
Location
Atlanta, Georgia, United States of America
Updated
22 Jul 2026
Source
PR Newswire

ConstructChat

Ask ConstructChat about 2025 Integrated Resource Plan (IRP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “2025 Integrated Resource Plan (IRP)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Atlanta, Georgia, United States. Taiyo aggregates data on it from PR Newswire.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Georgia Power has filed its 2025 Integrated Resource Plan (IRP) to meet the energy needs of its customers and support the state's growth. The plan includes investments in generation and transmission systems, enhancements to the power grid, and a focus on renewable energy options.

Original sector

Energy

Location

Country

United States of America (USA)

State

Georgia

City

Atlanta

Source

Source

PR Newswire

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-02-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project