logo
ProjectClosed

2025 Landfill Cell E2 Expansion Project

One of 10,000+ projects Taiyo tracks in Iowa.

Source: Dodge

Municipal Solid Waste Landfill Cell Expansion. 155,600 SF 60 mil HDPE liner over 24" Low Permeability Clay. Project includes approximately 2,934 LF of HDPE pipe, 75,000 CY of unclassified excavation and 5,500 CY Granular Drainage aggregate.

Status
Closed
Sector
Water Supply and Storage, Government, Biomass, Waste Processing and Treatment, Commercial
Location
Graettinger, Iowa, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2025 Landfill Cell E2 Expansion Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2025 Landfill Cell E2 Expansion Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Graettinger, Iowa, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Municipal Solid Waste Landfill Cell Expansion. 155,600 SF 60 mil HDPE liner over 24" Low Permeability Clay. Project includes approximately 2,934 LF of HDPE pipe, 75,000 CY of unclassified excavation and 5,500 CY Granular Drainage aggregate.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Iowa

City

Graettinger

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Biomass, Waste Processing and Treatment, Commercial

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project