2025 LMIG Surfacing
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
2025 LMIG-TSPLOST Project (including Howard Road, Piedmont Road and Zebulon Road) This project will be funded with 2025 LMIG and TSPLOST funds. Construction includes work at 3 separate locations as outlined in different plan sets, Asphalt Patching and Resurfacing on Howard Road (1.18 mi), Piedmont Road (5.28 mi) and Zebulon Road (2.87 mi) within Lamar County. All work shall conform to the Georgia
- Status
- Closed
- Sector
- Road, Manufacturing (Industrial), Commercial, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 LMIG Surfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 2025 LMIG-TSPLOST Project (including Howard Road, Piedmont Road and Zebulon Road) This project will be funded with 2025 LMIG and TSPLOST funds. Construction includes work at 3 separate locations as outlined in different plan sets, Asphalt Patching and Resurfacing on Howard Road (1.18 mi), Piedmont Road (5.28 mi) and Zebulon Road (2.87 mi) within Lamar County. All work shall conform to the Georgia Department of Transportation s (GDOT) Standard Specifications Construction of Transportation Syst... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Manufacturing (Industrial), Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
