2025 Lot 13 Retaining Wall Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The purpose of this project is to replace the existing timber retaining wall in Lot 13 with a CMU block/shotcrete finish retaining wall. Existing trees and utilities must be protected.
- Status
- Prospective
- Sector
- Government, Forest Products and Packaging, Commercial, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT)
- Location
- Snowmass Village, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Lot 13 Retaining Wall Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of this project is to replace the existing timber retaining wall in Lot 13 with a CMU block/shotcrete finish retaining wall. Existing trees and utilities must be protected. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Snowmass Village |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Forest Products and Packaging, Commercial, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT) |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
