2025 Maple Lake Structure Rehabilitation
Sector: Water Supply and Storage • Location: Maple Lake, Minnesota, United States of America
Source: Dodge
In general, the work consists of the construction of storm sewer improvements with approximately the following quantities: 75 LF of Storm Sewer Pipe Replacement 11 EA Storm Structure Replacements 4 EA Spectra Shield Structure Lining 300 SY of Bituminous Replacement 30 SY of Concrete DWY Replacement 555 LF of Concrete Curb and Gutter Replacement 50 SY of 4 & 6 Concrete Walk
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Commercial, Waste Processing and Treatment, Car parking, Automotive
- Location
- Maple Lake, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Maple Lake Structure Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the work consists of the construction of storm sewer improvements with approximately the following quantities: 75 LF of Storm Sewer Pipe Replacement 11 EA Storm Structure Replacements 4 EA Spectra Shield Structure Lining 300 SY of Bituminous Replacement 30 SY of Concrete DWY Replacement 555 LF of Concrete Curb and Gutter Replacement 50 SY of 4 & 6 Concrete Walk |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Maple Lake |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Commercial, Waste Processing and Treatment, Car parking, Automotive |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
