2025 Milling & Resurfacing Pavement Program
Sector: Mass Transit • Location: Orlando, Florida, United States of America
Source: Dodge
The scope of work for the 2025 Milling & Resurfacing Pavement Program includes, but is not limited to; Maintenance of Traffic/ Lane Closures, Erosion and Sedimentation Control, Guardrail Removal and Replacement, Curb and Gutter Removal and Replacement, Milling and Resurfacing, Signage and Pavement Markings.
- Status
- Closed
- Sector
- Mass Transit, Government, Consumer Products, Road, Commercial, Rail, Manufacturing (Industrial)
- Location
- Orlando, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Milling & Resurfacing Pavement Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work for the 2025 Milling & Resurfacing Pavement Program includes, but is not limited to; Maintenance of Traffic/ Lane Closures, Erosion and Sedimentation Control, Guardrail Removal and Replacement, Curb and Gutter Removal and Replacement, Milling and Resurfacing, Signage and Pavement Markings. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Orlando |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Government, Consumer Products, Road, Commercial, Rail, Manufacturing (Industrial) |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in United States of America
- WMATA Orange and Blue Line Rehabilitation
- Dulles Metrorail Silver Line, Phase 2
- Broadway Substation Upgrades
- QLINE Streetcar Overhead Catenary System
- Blue Line Rail Power System Upgrades
- Congress Heights Station & Tunnel
- Navy Yard Metro West Entrance Modifications
- BART El Cerrito Del Norte Station Modernization Project
