2025 NBCSD Parking Lot Area
Sector: Water Supply and Storage • Location: Loysburg, Pennsylvania, United States of America
Source: Dodge
Provide the necessary labor, materials and supervision required to pave the Roadway portion around the Highschool and adjacent parking stalls near the stadium. Curb is to be sawed flush with existing roadway portion marked out by the district. Build up leveling shall be used to ensure that the final wearing course is flush with the existing sidewalk and existing drains. Utilize milling or leveling
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Stadium, Car parking, Automotive, Commercial, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Loysburg, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 NBCSD Parking Lot Area
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Provide the necessary labor, materials and supervision required to pave the Roadway portion around the Highschool and adjacent parking stalls near the stadium. Curb is to be sawed flush with existing roadway portion marked out by the district. Build up leveling shall be used to ensure that the final wearing course is flush with the existing sidewalk and existing drains. Utilize milling or leveling to ensure no ponding of water occurs. Re-painting of lines in parking areas will be affected by ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Loysburg |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Stadium, Car parking, Automotive, Commercial, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
