logo
ProjectClosed

2025 New Washington Water Main Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

2025 New Washington Water Main Replacement project consisting of furnishing and installing approximately 1,298 LF of 6-inch water main pipe and 11 service line reconnections Base Bid, as well as approximately 1,062 LF of 6-inch water main pipe and 13 service reconnections Additive Alternate Bid 1, with related appurtenances such as ductile iron fittings, etc

Status
Closed
Sector
Water Supply and Storage, Metal, Government, Waste Processing and Treatment, Commercial, Manufacturing (Industrial), Steel
Location
New Washington, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2025 New Washington Water Main Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2025 New Washington Water Main Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in New Washington, Ohio, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

2025 New Washington Water Main Replacement project consisting of furnishing and installing approximately 1,298 LF of 6-inch water main pipe and 11 service line reconnections Base Bid, as well as approximately 1,062 LF of 6-inch water main pipe and 13 service reconnections Additive Alternate Bid 1, with related appurtenances such as ductile iron fittings, etc

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

New Washington

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Metal, Government, Waste Processing and Treatment, Commercial, Manufacturing (Industrial), Steel

Article published date

2025-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project