2025 Newton Elementary School Improvements
One of 10,000+ projects Taiyo tracks in Illinois.
Source: Dodge
2025 Newton Elementary School Improvements - Bid Packages include: 3 Structural Concrete/Building Flatwork/Site Concrete 4 Masonry 5 Structural Steel & Misc. Metals 6 General Trades/Carpentry 7 Roofing/Sheet Metal/Metal Panels 9 Metal Stud/Drywall/ACT Ceilings 9.5 Flooring 9.9 Painting 21 Fire Suppression 22 Plumbing 23 HVAC 26 Electrical 31 Earthwork, Site Utilities, Landscaping
- Status
- Closed
- Sector
- Power Generation (CCGT), Power Transmission, Cement, Road, Steel, Government, Education, Metal, Commercial
- Location
- Newton, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Newton Elementary School Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 2025 Newton Elementary School Improvements - Bid Packages include: 3 Structural Concrete/Building Flatwork/Site Concrete 4 Masonry 5 Structural Steel & Misc. Metals 6 General Trades/Carpentry 7 Roofing/Sheet Metal/Metal Panels 9 Metal Stud/Drywall/ACT Ceilings 9.5 Flooring 9.9 Painting 21 Fire Suppression 22 Plumbing 23 HVAC 26 Electrical 31 Earthwork, Site Utilities, Landscaping |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Newton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Cement, Road, Steel, Government, Education, Metal, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
