2025 Northside Street & Utility Improvements
Sector: Water Supply and Storage • Location: Foley, Minnesota, United States of America
Source: Dodge
Grubbing Each 88 Sawing Concrete / Bitumnious Pavement (Full Depth) Lin Ft 2,383 Remove Water Main Lin Ft 2,980 Remove Sewer Pipe (Storm) Lin Ft 1,905 Remove Curb & Gutter Lin Ft 6,232 Remove Concrete Walk Sq Yd 3,058 Remove Concrete / Bituminous Driveway Pavement Sq Yd 1,994 Remove Bituminous Pavement Sq Yd 28,285 Excavation - Common (P) Cu Yd 19,673 Geotextile Fabric Type 7 Sq Yd 23,629 Aggregat
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Road, Government, Power Transmission, Waste Processing and Treatment, Cement, Commercial, Power Generation (CCGT), Car parking, Automotive
- Location
- Foley, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Northside Street & Utility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Grubbing Each 88 Sawing Concrete / Bitumnious Pavement (Full Depth) Lin Ft 2,383 Remove Water Main Lin Ft 2,980 Remove Sewer Pipe (Storm) Lin Ft 1,905 Remove Curb & Gutter Lin Ft 6,232 Remove Concrete Walk Sq Yd 3,058 Remove Concrete / Bituminous Driveway Pavement Sq Yd 1,994 Remove Bituminous Pavement Sq Yd 28,285 Excavation - Common (P) Cu Yd 19,673 Geotextile Fabric Type 7 Sq Yd 23,629 Aggregate Base (Cv) Class 5 (P) Cu Yd 9,479 Bituminous Paving Mix Ton 5,504 4-inch Pe Pipe Drain Lin Ft 7... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Foley |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Road, Government, Power Transmission, Waste Processing and Treatment, Cement, Commercial, Power Generation (CCGT), Car parking, Automotive |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
