2025 Pavement Management Program - Phase II
Sector: Water Supply and Storage • Location: East Brunswick, New Jersey, United States of America
Source: Dodge
This project consists of the reconstruction/re-surfacing of eighteen (18) local streets. The project entails the following general quantities: Hot Mix Asphalt, Milling, 3" or less (66,612 S.Y), Roadway Excavation, Unclassified (941 C.Y.), Hot Mix Asphalt, Surface Course, 9.5M64 (4,655 Tons), Hot Mix Asphalt, Surface Course, 12.5M64 (5,879 Tons), Hot Mix Asphalt, Base Course, 19M64 (1,075 Tons), D.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project consists of the reconstruction/re-surfacing of eighteen (18) local streets. The project entails the following general quantities: Hot Mix Asphalt, Milling, 3" or less (66,612 S.Y), Roadway Excavation, Unclassified (941 C.Y.), Hot Mix Asphalt, Surface Course, 9.5M64 (4,655 Tons), Hot Mix Asphalt, Surface Course, 12.5M64 (5,879 Tons), Hot Mix Asphalt, Base Course, 19M64 (1,075 Tons), D.G.A.B.C, 6" Thick (1,475 S.Y.), Reset Manhole Casting (71 Units), 6"x 9"x 20" Concrete Vertical C... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
