2025 Pavement Patching
Sector: Manufacturing (Industrial) • Location: Naperville, Illinois, United States of America
Source: Dodge
This project consists of asphalt street patching of varying sizes and depths and limited amounts of PCC street patching PCC curb and gutter replacement, pavement milling around structures, crack filling with mixture for craks, joints and flangeway, structure adjustments, short term pavement marking and all associated traffic control and turf restoration. The work under this contract is divided in
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Government, Commercial
- Location
- Naperville, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Pavement Patching
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of asphalt street patching of varying sizes and depths and limited amounts of PCC street patching PCC curb and gutter replacement, pavement milling around structures, crack filling with mixture for craks, joints and flangeway, structure adjustments, short term pavement marking and all associated traffic control and turf restoration. The work under this contract is divided in two phases. Phase 1 will being in the spring and will have work progress from north to siuth with... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Naperville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Government, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
