2025 Peyton MSMD Well Equipping REBID
Sector: Water Supply and Storage • Location: Peyton, Colorado, United States of America
Source: Dodge
Description: Work to be performed generally includes earthwork, excavation, utility installation, water piping installation, pitless adaptor, well piping, pump and submersible motors, electrical, variable frequency drives, meter vault, foundation, CMU electrical structure, and all incidental work required to complete the project as specified in the drawings and specifications. Qualifications of th
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Power Transmission, Government
- Location
- Peyton, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Peyton MSMD Well Equipping REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Description: Work to be performed generally includes earthwork, excavation, utility installation, water piping installation, pitless adaptor, well piping, pump and submersible motors, electrical, variable frequency drives, meter vault, foundation, CMU electrical structure, and all incidental work required to complete the project as specified in the drawings and specifications. Qualifications of the BIDDER should include experience in well equipping, civil utility sitework, the ability to post... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Peyton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Power Transmission, Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
