The Notice of Funding Opportunity announces the availability of $450,000,000 for FY 2025 PIDP projects provided by the Bipartisan Infrastructure Legislation. If additional funding for FY 2025 is appropriated by congress, the NOFO will be amended or supplemented accordingly. To apply for this announcement, you may: Submit an electronic application: In order to apply for new funding opportunities wh

Project Information FAQ

Project Information

5 Q
The project “2025 Port Infrastructure Development Program” is an infrastructure initiative in the Commercial sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Notice of Funding Opportunity announces the availability of $450,000,000 for FY 2025 PIDP projects provided by the Bipartisan Infrastructure Legislation. If additional funding for FY 2025 is appropriated by congress, the NOFO will be amended or supplemented accordingly. To apply for this announcement, you may: Submit an electronic application: In order to apply for new funding opportunities which are open to the public for competition, you may access the Grants.gov website portal. All funding opportunities and application kits are made available on Grants.gov. Unique Entity Identifier (UEI) and System for Award Management (SAM) Each applicant must: (1) be registered in SAM before submitting its application; (2) provide valid UEI in its application; and (3) continue to maintain an active SAM registration with current information at all times during which it has an active Federal award or an application or plan under consideration by a Federal awarding agency. MARAD may not make a FY 2024 PIDP grant award to an applicant until the applicant has complied with all applicable UEI and SAM requirements and, if an applicant has not fully complied with the requirements by the time MARAD is ready to make a PIDP grant award, MARAD may determine that the applicant is not qualified to receive a PIDP grant award and use that determination as a basis for making a PIDP grant award to another applicant. Submission Dates and Times Applications must be submitted to Grants.gov by 11:59 p.m. E.D.T. on April 30, 2025. Grants.gov attaches a time stamp to each application at the time that submission is complete. Applications with a time stamp after the deadline will not be considered. MARAD does not accept applications via mailed paper, fax machine, email, or other means. Please note that the Grants.gov registration process usually takes 2-4 weeks to complete. Funding Restrictions Not more than 25% ($112,500,000) can be awarded for projects in any one state. At least 25% of funding ($112,500,000) is reserved for small projects at small ports under 46 U.S.C. 54301(b) and not more than 10% of that amount can be used for development phase activities for small projects at small ports that do not result in construction. Additionally, not more than 10% of funds not reserved for small projects at small ports may be awarded for development phase activities for large projects that do not result in construction. To maximize flexibility for applicants and optimize the number of grants that can be awarded, MARAD will limit any single award to a small project at a small port to not more than $11,250,000 under both BIL funding and any additional PIDP funding that may become available under the annual appropriations act for FY 2025. The Federal share of the total costs of an eligible PIDP project must not exceed 80%; however, the Secretary may increase the Federal share of costs above 80% for: (1) a grant for a project that is located in a rural area; or (2) a grant awarded to a small project at a small port under 46 U.S.C. 54301(b). "Rural area" and "small project at a small port" are defined in Section A.3 of the NOFO. Other Submission Requirements Applications must be submitted through Grants.gov. If duplicate or multiple applications are received from an applicant, only the most recent application will be considered. Applicants are limited to one application describing one project, but that project may have multiple components if those components are demonstrated to have a functional nexus. For further information concerning this notice please contact the program office at PIDPgrants@dot.gov, or call Aubrey Parsons at 202–366– 8047.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data