2025 Red Deer Outfall Repair Program
Sector: Water Supply and Storage • Location: Red Deer, Alberta, Canada
Source: Dodge
The City of Red Deer manages approximately 300 stormwater outfalls that discharge into local rivers and creeks within city limits. Following significant flooding on the Red Deer River in 2013, 145 outfalls were inspected in 2014 to assess their condition. Based on orthophoto analysis, Outfalls 101, 14, and 50 were identified as having sustained damage from the flood and were selected for repair.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
- Location
- Red Deer, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Red Deer Outfall Repair Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Red Deer manages approximately 300 stormwater outfalls that discharge into local rivers and creeks within city limits. Following significant flooding on the Red Deer River in 2013, 145 outfalls were inspected in 2014 to assess their condition. Based on orthophoto analysis, Outfalls 101, 14, and 50 were identified as having sustained damage from the flood and were selected for repair. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Red Deer |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
