2025 Richfield Highway Improvement Program
Sector: Manufacturing (Industrial) • Location: Hubertus, Wisconsin, United States of America
Source: Dodge
The work, in general, will include the approximate quantities and items listed below 58,432 S.Y. Pulverize Asphalt 5,906 S.Y. Mill Asphalt 5 in Flood-plain 10963 S.Y. Mill Asphalt 2 7,288 S.Y. Remove Pulverized Material 2,310 C.Y. Base Patch Removal 4,679 Tons CrushedAggregate Base Course 6,935 S.Y. Soil Stabilization Fabric 10,712 Tons Lower Layer HMA Pavement 2.5 9,037 Tons Upper Layer HMA Pavem
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Government, Commercial
- Location
- Hubertus, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Richfield Highway Improvement Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work, in general, will include the approximate quantities and items listed below 58,432 S.Y. Pulverize Asphalt 5,906 S.Y. Mill Asphalt 5 in Flood-plain 10963 S.Y. Mill Asphalt 2 7,288 S.Y. Remove Pulverized Material 2,310 C.Y. Base Patch Removal 4,679 Tons CrushedAggregate Base Course 6,935 S.Y. Soil Stabilization Fabric 10,712 Tons Lower Layer HMA Pavement 2.5 9,037 Tons Upper Layer HMA Pavement 2.0 2,722 Tons 2' Shoulder - Imported Recycled Asphalt 1 L.S Traffic Control |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Hubertus |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Government, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
