2025 Ridgebrook Drive Drainage Improvements
Sector: Water Supply and Storage • Location: Nacogdoches, Texas, United States of America
Source: Dodge
The work includes installation of polypropylene storm pipe, pre-cast concrete curb inlets and junction boxes, tie-in to existing curb inlet, curb and gutter replacement, asphalt pavement repair, concrete driveway replacement, water line relocation, grading, erosion control, and traffic control.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Cement, Road, Commercial, Waste Processing and Treatment, Car parking, Raw Materials, Automotive
- Location
- Nacogdoches, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Ridgebrook Drive Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes installation of polypropylene storm pipe, pre-cast concrete curb inlets and junction boxes, tie-in to existing curb inlet, curb and gutter replacement, asphalt pavement repair, concrete driveway replacement, water line relocation, grading, erosion control, and traffic control. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Nacogdoches |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Road, Commercial, Waste Processing and Treatment, Car parking, Raw Materials, Automotive |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
