2025 Ringhofer Drive Utility Reconstruction
Sector: Water Supply and Storage • Location: North Mankato, Minnesota, United States of America
Source: Dodge
Miscellaneous removals 9,800 sq yd bituminous pavement (common excavation, 18" aggregate base, 4" PVC perforated underdrains, geogrid, B618 curb & gutter, 1.5" bituminous base course, 5.5" bituminous wearing course) 2,100 sq yd concrete driveway aprons & concrete sidewalks 2,600 lin ft 12" to 18" diameter storm sewer, with catch basins, manholes and casting assemblies 1,100 lin ft 8" & 65 lin ft 1
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Power Transmission, Car parking, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road, Automotive
- Location
- North Mankato, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Ringhofer Drive Utility Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Miscellaneous removals 9,800 sq yd bituminous pavement (common excavation, 18" aggregate base, 4" PVC perforated underdrains, geogrid, B618 curb & gutter, 1.5" bituminous base course, 5.5" bituminous wearing course) 2,100 sq yd concrete driveway aprons & concrete sidewalks 2,600 lin ft 12" to 18" diameter storm sewer, with catch basins, manholes and casting assemblies 1,100 lin ft 8" & 65 lin ft 10" diameter sanitary sewer, with manholes and services 700 lin ft 6" & 2,200 lin ft 12" diameter ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | North Mankato |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Power Transmission, Car parking, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road, Automotive |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
