logo
ProjectBidding

2025 Road Paving Project

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

he Town of Sullivan is seeking proposals for paving of the following road: Taunton Drive - 8970 ft. From Park Ave to the Franklin Town Line All the road will need to be milled /ground to at least 2 inches, depending on price. Specifications: All road sweeping and reclaimed asphalt will be disposed of by the Contractor Minimum Width of Asphalt Pavement shall be 22-24 feet and the cross slope shall

Status
Prospective
Sector
Government, Road, Commercial, Car parking, Automotive, Manufacturing (Industrial)
Location
Sullivan, Wisconsin, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2025 Road Paving Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2025 Road Paving Project” is an infrastructure initiative in the Government sector, located in Sullivan, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

he Town of Sullivan is seeking proposals for paving of the following road: Taunton Drive - 8970 ft. From Park Ave to the Franklin Town Line All the road will need to be milled /ground to at least 2 inches, depending on price. Specifications: All road sweeping and reclaimed asphalt will be disposed of by the Contractor Minimum Width of Asphalt Pavement shall be 22-24 feet and the cross slope shall be per foot Tack coatings shall be applied between milled asphalt to MDOT Specs. All existing roa...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Sullivan

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Road, Commercial, Car parking, Automotive, Manufacturing (Industrial)

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project