logo
ProjectClosed

2025 Road Rehabilitation Program- Phase 1

One of 10,000+ projects Taiyo tracks in Alberta.

Source: Dodge

Work will include full depth reclamation of existing road surface and asphalt paving, thermoplastic line painting, waste excavation, various concrete structure spot replacements, base gravel installation, repairs to storm sewer infrastructure, asphalt trails reconstruction as well as landscaping. Approximate Quantities: 951 m2 of Cold Mill Asphalt Surface 829 m2 of Asphalt Removals 969 L.M. of Con

Status
Closed
Sector
Cement, Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Manufacturing (Industrial)
Location
Grande Prairie, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2025 Road Rehabilitation Program- Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2025 Road Rehabilitation Program- Phase 1” is an infrastructure initiative in the Cement sector, located in Grande Prairie, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work will include full depth reclamation of existing road surface and asphalt paving, thermoplastic line painting, waste excavation, various concrete structure spot replacements, base gravel installation, repairs to storm sewer infrastructure, asphalt trails reconstruction as well as landscaping. Approximate Quantities: 951 m2 of Cold Mill Asphalt Surface 829 m2 of Asphalt Removals 969 L.M. of Concrete Structure Removals (All types) 471 m3 of Waste Excavation 20 ea. of Type 1 CB, CBMH, or MH ...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Grande Prairie

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Manufacturing (Industrial)

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project