2025 Sanitary Sewer Laterals Renewal & Repair Bid Pkg 2 IQC
Sector: Water Supply and Storage • Location: San Antonio, Texas, United States of America
Source: Dodge
The purpose of retaining a Contractor to furnish all labor, materials, equipment and supervision to perform point repairs to the wastewater collection system pipelines, to adjust manholes, and to renew laterals, on a work order contract basis. Some of the work involved in the projects might require manhole rehabilitation, manhole replacement, cleanout installation, backwater valve installation, co
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Waste Processing and Treatment, Cement, Commercial
- Location
- San Antonio, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Sanitary Sewer Laterals Renewal & Repair Bid Pkg 2 IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of retaining a Contractor to furnish all labor, materials, equipment and supervision to perform point repairs to the wastewater collection system pipelines, to adjust manholes, and to renew laterals, on a work order contract basis. Some of the work involved in the projects might require manhole rehabilitation, manhole replacement, cleanout installation, backwater valve installation, concrete flatwork, erosion control, topsoil, sodding, fence relocations, and street patching and re... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | San Antonio |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Waste Processing and Treatment, Cement, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
