2025 Sanitary Sewer Lining & Repairs
Sector: Water Supply and Storage • Location: Swisher, Iowa, United States of America
Source: Dodge
The Project shall consist of: Approximately 2,971 feet of CIPP Main lining,8" VCP sanitary sewer, sanitary sewer in-situ spot repairs at approximately 4 feet upstream of Manhole 72 and at approximately 10 feet upstream of Manhole 66, including sewer cleaning and root removal and CIPP service pipe connections as necessary. Lining and repairs will occur in Regions 1-3 as identified in the Swisher Se
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Swisher, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Sanitary Sewer Lining & Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project shall consist of: Approximately 2,971 feet of CIPP Main lining,8" VCP sanitary sewer, sanitary sewer in-situ spot repairs at approximately 4 feet upstream of Manhole 72 and at approximately 10 feet upstream of Manhole 66, including sewer cleaning and root removal and CIPP service pipe connections as necessary. Lining and repairs will occur in Regions 1-3 as identified in the Swisher Sewer Maintenance Plan. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Swisher |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
