2025 Sanitary Sewer Rehabilitation
Sector: Water Supply and Storage • Location: Houston, Texas, United States of America
Source: Dodge USA
The project consists of rehabilitation of approximately 4,454 linear feet of 8-inch, 10-inch, 12-inch, and 15-inch sanitary sewers by cured in-place pipe, including 3 service lead reconnects, heavy cleanings, and pre and post-construction sanitary sewer cleaning and televising. The project is located in Harris County Municipal Utility District No. 25, Harris County, Texas in the city of Houston. T
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Residential, Government, Waste Processing and Treatment, Road, Power Transmission, Power Generation (CCGT)
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2025 Sanitary Sewer Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of rehabilitation of approximately 4,454 linear feet of 8-inch, 10-inch, 12-inch, and 15-inch sanitary sewers by cured in-place pipe, including 3 service lead reconnects, heavy cleanings, and pre and post-construction sanitary sewer cleaning and televising. The project is located in Harris County Municipal Utility District No. 25, Harris County, Texas in the city of Houston. The District is generally bounded to the north by Philippine Street, to the south by West Gulf Ban... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Residential, Government, Waste Processing and Treatment, Road, Power Transmission, Power Generation (CCGT) |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
