2025 SERSG DPW Services IQC
Sector: Water Supply and Storage • Location: Sharon, Massachusetts, United States of America
Source: Dodge USA
Sidewalk Construction with Curbs and Edging, The following services are being contracted for one year only. They are: Cold In-Place Recycling; Permanent Trench Patch Repairs; Chip Seal; Rubber Chip Seal; Micro Paving; Cape Sealing; Bonded Wearing Course; Crack Sealing; Polymer- Modified Crack Sealing/Hot Asphaltic Filler; Traffic Line Painting with Chlorinated Rubber, Thermoplastic or Epoxy; Guard
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Cable car, Rail, Automotive, Commercial, Car parking, Waste Processing and Treatment, Road, Chemical (Industrial), Manufacturing (Industrial), Telecommunications
- Location
- Sharon, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2025 SERSG DPW Services IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sidewalk Construction with Curbs and Edging, The following services are being contracted for one year only. They are: Cold In-Place Recycling; Permanent Trench Patch Repairs; Chip Seal; Rubber Chip Seal; Micro Paving; Cape Sealing; Bonded Wearing Course; Crack Sealing; Polymer- Modified Crack Sealing/Hot Asphaltic Filler; Traffic Line Painting with Chlorinated Rubber, Thermoplastic or Epoxy; Guard Rail Installa- tion; Structure Work; Sub-Drain Installation; Catch Basin Cleaning; Catch Basin C... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Sharon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cable car, Rail, Automotive, Commercial, Car parking, Waste Processing and Treatment, Road, Chemical (Industrial), Manufacturing (Industrial), Telecommunications |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
