logo
ProjectClosed

2025 Service Line Bore Project

Closed · Tennessee · Last reported Mar 2025

Source: Dodge

This project consists of approximately 300 linear feet of two 2 inch diameter SDR 11 HDPE line and appurtenances for the Bedford County Utility District

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Commercial, Waste Processing and Treatment, Government, Power Generation (CCGT)
Location
Shelbyville, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2025 Service Line Bore Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2025 Service Line Bore Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Shelbyville, Tennessee, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of approximately 300 linear feet of two 2 inch diameter SDR 11 HDPE line and appurtenances for the Bedford County Utility District

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Shelbyville

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Commercial, Waste Processing and Treatment, Government, Power Generation (CCGT)

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project