2025 Sewer Main Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
GENERAL WORK DESCRIPTION The work, in general, to be done under this contract consists of removal and replacement of approximately 2,500 linear feet of sewer pipeline. This includes the upsizing of the existing 5 vitrified clay pipes to 6 PVC pipes and replacement of existing 8 vitrified clay pipes with 8 PVC pipes.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Sewer Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | GENERAL WORK DESCRIPTION The work, in general, to be done under this contract consists of removal and replacement of approximately 2,500 linear feet of sewer pipeline. This includes the upsizing of the existing 5 vitrified clay pipes to 6 PVC pipes and replacement of existing 8 vitrified clay pipes with 8 PVC pipes. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
