2025 Sewickley Road Program
Sector: Cement • Location: Sewickley, Pennsylvania, United States of America
Source: Dodge
CONTRACT A - BASE BID Includes Pavement, and Curb maintenance of Borough Streets, including but not limited to the following: 3.5 Profile Milling, Soft Spot Repair, 2 of 19mm Superpave Binder Course, 1.5 of 9.5mm Fine Graded Superpave Wearing Course, Removal and Replacement of Concrete Curb, Removal and Replacement of Bituminous Wedge curb, ADA Curb Ramp Replacements, Line Striping, Traffic Contro
- Status
- Closed
- Sector
- Cement, Government, Road, Commercial, Car parking, Automotive, Manufacturing (Industrial)
- Location
- Sewickley, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Sewickley Road Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CONTRACT A - BASE BID Includes Pavement, and Curb maintenance of Borough Streets, including but not limited to the following: 3.5 Profile Milling, Soft Spot Repair, 2 of 19mm Superpave Binder Course, 1.5 of 9.5mm Fine Graded Superpave Wearing Course, Removal and Replacement of Concrete Curb, Removal and Replacement of Bituminous Wedge curb, ADA Curb Ramp Replacements, Line Striping, Traffic Control, Resident Notification, and Restoration, complete in place. ADD ALTERNATE - GRIMES STREET Inclu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Sewickley |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Road, Commercial, Car parking, Automotive, Manufacturing (Industrial) |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
