logo
ProjectClosed

2025 Sidewalk Curb & Gutter Concrete Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

2025 Sidewalk/Driveway/Apron and Curb and Gutter Concrete Replacement Program at various locations throughout the City - 1. pcc-sidewalk in place 6,000-10,000 square foot 10,000 x unit cost 2.a. pcc-sidewalk in place with curb-ada 3,000-5,000 square foot 5,000 x unit cost 2.b. pcc- curb-ada 2,000-4,000 lineal foot 4,000 x unit cost 3.a. pcc-drive way apron 2,000-10,500 square foot 10,500 x unit co

Status
Closed
Sector
Road, Car parking, Commercial, Government, Cement, Automotive
Location
Darien, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2025 Sidewalk Curb & Gutter Concrete Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2025 Sidewalk Curb & Gutter Concrete Replacement” is an infrastructure initiative in the Road sector, located in Darien, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

2025 Sidewalk/Driveway/Apron and Curb and Gutter Concrete Replacement Program at various locations throughout the City - 1. pcc-sidewalk in place 6,000-10,000 square foot 10,000 x unit cost 2.a. pcc-sidewalk in place with curb-ada 3,000-5,000 square foot 5,000 x unit cost 2.b. pcc- curb-ada 2,000-4,000 lineal foot 4,000 x unit cost 3.a. pcc-drive way apron 2,000-10,500 square foot 10,500 x unit cost 3.b. pcc-drive way apron with fiber mesh 2,000-15,500 square foot 15,500 x unit cost 4. pcc cu...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Darien

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Car parking, Commercial, Government, Cement, Automotive

Article published date

2024-12-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project