2025 Sidewalk Replacement Program B
One of 10,000+ projects Taiyo tracks in Illinois.
Source: Dodge
Scope of work includes, but is not limited to PCC sidewalk removal and replacement (standard, colored), combination concrete curb and gutter removal and replacement and all associated and incidental work, including but not limited to, road, driveway and turf restoration, hauling, and traffic control as well as curb and gutter removal and replacement.
- Status
- Prospective
- Sector
- Car parking, Commercial, Automotive, Government, Cement, Road
- Location
- Downers Grove, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Sidewalk Replacement Program B
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work includes, but is not limited to PCC sidewalk removal and replacement (standard, colored), combination concrete curb and gutter removal and replacement and all associated and incidental work, including but not limited to, road, driveway and turf restoration, hauling, and traffic control as well as curb and gutter removal and replacement. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Downers Grove |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Automotive, Government, Cement, Road |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
